List of Current Projects (Ongoing Projects)

S. No.

Client

Project Manager

Description of Work

Reference

Duration

Start

Complete

1.         

Ministry of Education – Al-Jouf

Eng’r. Jalal Hamuda

Construction of Main Administration Building at Sakaka Al-Jouf.

Ministry of Education

15-1-1426H

14-6-1428H

2.         

Ministry of Justic-Al-Jouf

Eng’r. Hany Hamza Hanoura

Construction main Administration building of Justic Ministry, Sakaka, Al-Jouf.

Ministry of Justice

20-3 1426

19-3-1429

3.         

GDMW-MODA

Eng’r. Mati Qaudri

Construction of Three Schools Buildings at KKMC, Hafar Al-Batin.

GDMW-MODA

11-3-1427H

10-9-1429H

4.         

SEC-COA

Eng’r. Moin Uddin Shaikh

Laying of FOC Cable from Al-Qassim Power Plant to Medina Munawarah for a Distance of 500Km  including Telecom Repeater Shelters Splicing, Terminate & Testing.

Underground Fiber Optic Cable Link.

Contract # 10531176/00

23-4-2006G

22-10-2007G

5.         

Red Crescent

Project

 

Eng’r. Ahmed Kamal

Main Building Consists Of Basement + 3 floor (7000 Sq.m) + Site work + Water Tank + Utility.

Ministry of Finance

05-03-1427H

05-09-1428H

6.         

Technical College Qassim

 

Eng’r. Abdul Karim

Consist of 18 Building (24000 Sq.m) different types offices building & workshop for training & site work (12,000 Sq.m) with land scope.

General Establishment for Technical Education & Training.

May, 2007

Feb, 2009

7.         

OSP/PDS upgrading of Cabling System West Operating Area

CN: 20561101/00

Eng’r. Tasawar E. Qureshi

Installation of Outside/Inside plant telephone & F.O Cable, PDS System Local Area Network (PDS-LAN) & its associated equipment.

Different Location of Western Operating Area

June-2006

Dec.-2008

8.         

SEC-COA

Eng’r. Moin Uddin Shaikh

Supply & Laying of FOC Cable from Ruwaydah 8605 S/S (COA)-Al Muwyah 110/33KV S/S (WOA) for a Distance of 360Km  including Splicing, Terminate & Testing.

Underground Fiber Optic Cable Link.

Contract # 10631150/00

Dec-07

Dec-08

9.         

Al-Zakry

Eng'r. Nurul Alam

Consist of 100 Residential Villas (17000 Sq.m) different types in Yanbu.

ZAKRY GROUP

2-2-2007

1-2-2009

10.      

Building

T10 & T11

Al-Qasr, Riyadh

Dar-Al-Arkan

Eng’r. Hany Hamza Hanoura

Consist of 2 Building (46000 Sq.m) different types Residential building.

Dar-Al-Arkan Real Estate Co. (Turner)

March-2007

May-2008

11.      

ARAMCO Gulf Operations

Mohd. Shoaib Ashraf

FIBER OPTIC CABLE CONNECTIVITY BETWEEN GATHERING STATION AND ALL FLOW STATIONS                       ( Y1, Y2, Y3, Y4 )

Contract No.  BT 649 IT07

August, 2007

January, 2008

12.      

STC-Jizan

CN: 2032512

Eng'r. Ibrahim Ghulam

Design & Engineering of FOC laying of FOC Installation MSAN Cabinets, Splicing, Testing Commissioning, Laying of Copper Cables, Placing of MH's/HH's, PE duct jointing, Testing & Commissioning.

STC-Jizan

CN: 2032512

April, 2007

-

13.      

STC-Taif

CN: 2032512

Irfan Najam Najmul Ghani

Design & Engineering of FOC laying of FOC Installation MSAN Cabinets, Splicing, Testing Commissioning, Laying of Copper Cables, Placing of MH's/HH's, PE duct jointing, Testing & Commissioning.

STC-Taif

CN: 2032512

April, 2007

-

14.      

STC-Al-Baha

CN: 2032512

Mr. Naeem Khadin

Design & Engineering of FOC laying of FOC Installation MSAN Cabinets, Splicing, Testing Commissioning, Laying of Copper Cables, Placing of MH's/HH's, PE duct jointing, Testing & Commissioning.

STC-Al-Baha

CN: 2032512

April, 2007

-

15.      

STC-Yanbu

CN: 2032512

Eng'r. Zahir Alam Sarker

Design & Engineering of FOC laying of FOC Installation MSAN Cabinets, Splicing, Testing Commissioning, Laying of Copper Cables, Placing of MH's/HH's, PE duct jointing, Testing & Commissioning.

STC-Yanbu

CN: 2032512

April, 2007

-

 
 
   

Home|About Us|Services|Projects List|Careers|Contact