Al-Najdain works and follows the
International standards for detailed design, supply, installation, testing and commissioning of outside plant Networks for all power plants as per following stages
- It's included base design and drawing in which we are capable to provide as
following
- Drawing control sheet.
- Communication and civil works.
- Cable Route/ Schematic diagram.
- Map showing UGN F.O.C/Copper/SSN F.O.C joint location.
- Plan and Profile.
- List of Materials.
- Cross-Section details.
- Horizontal direction drilling (HDD) cross section details.
- Wadi/ Bridge areas Cross-Section details.
- Communication room and equipment layout.
- Communication telecom repeaters shelters, equipment and other accessories layout.
- We are working on the strategic plan and design for the distribution of outside plants cables which is enhance the efficient utilization and management of communication ducts bank and cables.
- Original manufacturer technical specification catalog as per clients requirement and specification.
- Project implementation schedule to monitor and control of project activity.
- Loss prevention program.
- Site security plan.
- Site pre-commissioning and test plan.
- Health and Safety Plan.
- Test Procedure Plan and its related formats.
- Quality and Insurance Plan.
- Preliminary design drawing.
- Final design and construction drawing
| Civil Works: Primary and Secondary |
- Supply and installation of different type main holes, hand holes, Conduct, HDD, Bridge crossing, with moleploughing, Direct
buried installation and finally reinstatement.
| Copper Cable (STP and UTP) |
-
Copper cable includes installation of main distribution frames. Telephone terminal cabinets, data cabinets with
their termination and Testing, telephone terminal blocks, protection modules, data patch panel (copper (RJ-45) connectors), dedicated communication grounding system and other accessories.
| Fiber Optic Cable (SM and MM) |
-
it's include Supply, Installation, Pulling by different modes such as Splicing, Termination, Pre-installation test, Post installation test, Link test, Commissioning and as built drawings.
- It's include stripping of conductor, Preparation, Fixing of closure, Splicing, Testing (Pre Installation Test, Post Installation Test), Link test at different
wavelength as per clients specification and requirement with
their document and as build.
|